    It's a race for heat at MSA Professional Services! The building will be enclosed very soon which means warmer working conditions. The roof is about half of the way done and windows will be done very soon. Drywall will start to be hung next week along with the metal panel exterior. EIFS will also be started next week. What is EIFS? EIFS stands for Exterior Insulation and Finish System. This will provide an insulated and water-resistant surface for the exterior of the building.

    Sullivan designBUILD // December, 12 2018

    Albion Salt Storage July Update

    WOW! Check out the trusses going up at Albion Salt Storage! The trusses are being assembled in batches and are set in place by crane. Each truss is made up of 4 pieces to span the buildings 82’ width! Roofing and siding should be starting in two to three weeks with substantial completion slated for September 5th! This 13,500 sqft Salt Shed will provide salt for the roads in the town of Albion and neighboring areas including I-39 for our icy Wisconsin winters!
    Go to Post
    Sullivan designBUILD // July, 18 2019

    Stoughton Public Works Completion

    Take a photo tour of the new Stoughton Public Works Facility in Stoughton, WI. The facility is more than 58,000 sqft with a 14,000 sqft cold storage facility and just over 2,500 sqft salt storage.
    Go to Post
    Sullivan designBUILD // July, 11 2019